ARCO Completes California Cross-Dock Distribution Facility for Scannell Properties & GE Appliances

ARCO COMPLETES CALIFORNIA CROSS-DOCK DISTRIBUTION FACILITY FOR SCANNELL PROPERTIES & GE APPLIANCES

Throughout the project, ARCO helped us overcome hurdles that kept the project moving forward. Many of the major issues were encountered in the design and predevelopment phase, so it was helpful to have ARCO’s expertise in value-engineering at the forefront.
Mac Carlsen
Scannell Properties

ARCO recently completed a 502,334 SF cross-dock distribution facility for repeat client Scannell Properties and end-user GE Appliances, a Haier company. Located in Dixon, California, at the time of construction, the project was the first large-scale warehouse to be built in the region in more than 20 years.
The facility features 100 dock positions, 200 trailer stalls, queuing space for 10 trucks, and a 13,924 SF office.

The LEED® certified warehouse also has several environmentally conscious features such as LED lighting and sustainable bioswales in lieu of traditional storm sewers.

On behalf of the Scannell Properties West Coast Team, I would like to express our appreciation for ARCO National Construction on our recently completed project in Dixon, California. ARCO executed a quality design-build of our 500,000 square foot project on behalf of our valued client, GE-Haier. Throughout the project, ARCO helped us overcome hurdles that kept the project moving forward. Many of the major issues were encountered in the design and predevelopment phase, so it was helpful to have ARCO’s expertise in value-engineering at the forefront. ARCO brought on a stable of excellent local subcontractors that performed well and showed flexibility with design changes and start-and-stops as the project proceeded.

I give ARCO National Construction my sincere recommendation based on our Dixon project and look forward to working with them on the next one.

testimonial author
Mac Carlsen
Scannell Properties

Project Details

  • 502,234 SF Cross-Dock Distribution Facility
  • 13,924 SF Office
  • Tilt-Up Construction
  • 6” Reinforced Floor Slab
  • 4,200 SF Battery Charging Station
  • 5,000 SF Maintenance Area
  • 60-Mil TPO Mechanically Attached Roof System
  • LED Lighting
  • 32’ Clear Height
  • Bioswales in Lieu of Traditional Storm Sewers
  • LEED® Certified
Recommend
Share
Tagged in