Molina Healthcare Tenant Improvement | Los Angeles, CA

lorem ipsum
Recommend
  • Facebook
  • Twitter
  • LinkedIN
  • Pinterest
Share
Tagged in
Description

MOLINA HEALTHCARE | TENANT IMPROVEMENT

LOS ANGELES, CA

 

14,000 SF 12th Floor Office Renovation

__________    

  • Updated Finishes Throughout
  • ADA Restroom Remodel
  • Upgraded HVAC VAVs and Added DDC Controls that Tie to Building Management System (BMS)
  • Two (2) Month Construction Duration
  • LVT, SDT, Cermaic and Carpet Throughout
  • Replaced and Reworked Fine-Line Ceiling Grid
  • Expanded Open Office Layout
  • Breakroom Remodel
  • LED Lighting Retrofit
  • Floors Above and Below Occupied Throughout Construction
  • Preconstruction Services Include Architectural, Engineering, Permitting, MEP Design and Full Design/Build Delivery